Yes, it needs some work, but its running quite good now.
Recapping the center section eliminated a lot of weird behaviour.
I never used the original PSUs, bought a new psu from Malcom toft.
Happy so far…
Alteady made new pcbs for the routing cards and ordered new caps and switches.
Its not 16 channel buckets, its 4 Buckets in total.
1x 24 CH Bucket left side, 2x center section Bucket, 1x 20 CH Bucket right side.
Perfect fit for me, especially with the remote patchbay.👍🏻
Best,
Tilmann