Author Topic: ssl 8000 transporting  (Read 8565 times)

lukeaudio

  • Jr. Member
  • **
  • Posts: 65
  • Karma: +0/-0
ssl 8000 transporting
« on: June 07, 2014, 02:03:00 PM »
Hi guys,

Finally I bought the console, but I want some advices about how I can transport it to my studio? which tools I need?..

I thought removing all the modules and separate the console in two parts  because in my country doesn't exist a expert company that do this.

which are your advices?

thank you very much

luke

sintech

  • Global Moderator
  • Hero Member
  • *****
  • Posts: 839
  • Karma: +61/-0
    • Bristol, UK
Re: ssl 8000 transporting
« Reply #1 on: June 07, 2014, 09:05:19 PM »
That size, I would transport in one piece. Taking the legs off to get through any doorways.

Check James Lugo's Youtube's this one in particular will give you the best idea of what's involved:

https://www.youtube.com/watch?v=YyEseFqRqAI

radardoug

  • Jr. Member
  • **
  • Posts: 50
  • Karma: +1/-4
Re: ssl 8000 transporting
« Reply #2 on: June 08, 2014, 02:20:08 AM »
I would definitely remove the modules and pack them separately. With the modules in the frame in a transport condition, the modules will vibrate and move in their mating connectors. This could cause damage to the connectors. These are big modules and not made for constant moving. Also once you have packed them separatelt, if you have an accident you may only affect one or two modules.
Moving one of these frames is not an easy job, the more weight you can get out of it, the better.

marcmozart

  • Sr. Member
  • ****
  • Posts: 483
  • Karma: +29/-0
    • Frankfurt/Germany
    • Mozart & Friends
Re: ssl 8000 transporting
« Reply #3 on: June 08, 2014, 09:11:27 AM »
The console-dealers who import these monsters e.g. from Japan are having very solid wooden boxes that fit a bucket of modules each. Unless you have a way to box the modules in a way that really protects them, I would suggest to leave them in. Once out, the modules are more easily damaged. IMHO, they are quite secure in the frame. It's true that the frame gets lighter, but it will always be heavy. FWIW, here's a video of transporting my console...

http://youtu.be/ty_SPobPmMg

I had 6 guys from a professional moving company (+ professional tools) helping where I picked up the console. Easy job. Then, when I got to my place, I had 8 clumsy songwriters helping me, and it took us about 10 hours to move the console 8 meters. Nightmare! You definitely want to be prepared. Mind you, my console is a monster compared to yours.

BTW, to access the screws to remove the legs, you have to remove 2 or 3 modules above the legs. Legs will have to be removed, otherwise you won't get the console through a standard door.

I would definitely remove the modules and pack them separately. With the modules in the frame in a transport condition, the modules will vibrate and move in their mating connectors. This could cause damage to the connectors. These are big modules and not made for constant moving. Also once you have packed them separatelt, if you have an accident you may only affect one or two modules.
Moving one of these frames is not an easy job, the more weight you can get out of it, the better.
1992 SSL 4048 G-Series
Mix Engineer Blog
http://www.mixedbymarcmozart.com

sintech

  • Global Moderator
  • Hero Member
  • *****
  • Posts: 839
  • Karma: +61/-0
    • Bristol, UK
Re: ssl 8000 transporting
« Reply #4 on: June 08, 2014, 09:23:08 AM »
Agree, leave the modules in, unless you have a better option for them.

But remove all modules at the destination, and move the frame empty :-)

lukeaudio

  • Jr. Member
  • **
  • Posts: 65
  • Karma: +0/-0
Re: ssl 8000 transporting
« Reply #5 on: June 08, 2014, 05:27:57 PM »
Hi guys,

Thanks for your advices,  the best choice for me is remove all modules. I have two questions:

-Which tools I need to remove all modules and the legs?
-There is a possibility to divided the frame in two parts ?

Thank you

Luke

Artur D'Assumpção

  • Hero Member
  • *****
  • Posts: 661
  • Karma: +23/-0
  • Sintra, Portugal
Re: ssl 8000 transporting
« Reply #6 on: June 08, 2014, 10:31:56 PM »
You have to check on the 8000 documentation where did SSL placed a split point in your console. This would vary depending on the client's need.

Matt Sartori

  • Administrator
  • Hero Member
  • *****
  • Posts: 749
  • Karma: +21/-0
    • London
    • Solid State Logic Fanatics Database
Re: ssl 8000 transporting
« Reply #7 on: June 09, 2014, 12:05:27 AM »
splitting a console for transportation is not rocket science but it ain't easy either.
if you have not done it before get a tech in.
you will save a lot of money and time, I have seen it before.

M.

sintech

  • Global Moderator
  • Hero Member
  • *****
  • Posts: 839
  • Karma: +61/-0
    • Bristol, UK
Re: ssl 8000 transporting
« Reply #8 on: June 09, 2014, 08:25:52 AM »
I can see the point splitting a 72+ channel, but this is a small 32 frame with RHS Patch.

Better to have more hands and move it in one shot.